Contents - Continued
MIL-STD-810H, Environmental Engineering Considerations and Laboratory Tests
Last Updated 29 Oct 2026
Hover any section to copy its link or text, ask Copilot about it, or bookmark it.
4 tables appear under this heading.
1. PDF page 853
| Paragraph | | Page |
|---|
| 4.5.2 | PROCEDURE SPECIFIC. | 17 |
| 4.5.2.1 | PROCEDURE I-SESA REPLICATION OF A FIELD MEASURED MATERIEL TIME TRACE INPUT/RESPONSE. | 17 |
| 4.5.2.2 | PROCEDURE II-SESA REPLICATION OF AN ANALYTICALLY SPECIFIED MATERIEL TIME TRACE INPUT/RESPONSE | 18 |
| 4.5.3 | DATA ANALYSIS | 18 |
| 5. | ANALYSIS OF RESULTS.. | 18 |
| 5.1 | PHYSICS OF FAILURE.. | 18 |
| 5.2 | QUALIFICATION TESTS. | 18 |
| 5.3 | OTHER TESTS | 19 |
| 6. | REFERENCE/RELATED DOCUMENTS. | 19 |
| 6.1 | REFERENCED DOCUMENTS | 19 |
| 6.2 | RELATED DOCUMENTS.. | 19 |
2. PDF page 853
| FIGURE 525.2-1. | BASIC TWR TEST MODES AS RELATED TO TIME TRACE SCALING | 4 |
| FIGURE 525.2-2. | BASIC TWR TEST SIMULATION COMBINATIONS | 6 |
3. PDF page 853
| 1. | PURPOSE | A-1 |
| 2. | GENERAL PHILOSOPHY FOR TWR TESTING | A-1 |
| 3. | DESCRIPTION OF REFERENCE TIME TRACE | A-1 |
| 4. | TIME TRACE PRE-PROCESSING | A-2 |
| 4.1 | INTRODUCTION | A-2 |
| 4.2 | FREQUENCY BAND LIMITING | A-4 |
| 4.3 | TIME TRACE CORRELATION | A-5 |
| 4.4 | TIME TRACE SEGMENT IDENTIFICATION | A-6 |
| 5. | POST-TEST PROCESSING FOR TPP | A-9 |
| 6. | TPP TRANSIENT VIBRATION | A-10 |
| 7. | TPP STATIONARY VIBRATION | A-13 |
| 8. | TPP SHOCK | A-18 |
| 9. | POST-TEST PROCESSING FOR STA | A-22 |
4. PDF page 855
| Paragraph | Page |
|---|
| ANNEX B TABLE |
| TABLE 525.2B-I. SUMMARY OF ERROR ASSESSMENT EXPRESSIONS | B-3 |