Rain contents
MIL-STD-810H, Environmental Engineering Considerations and Laboratory Tests
Last Updated 29 Oct 2026
Hover any section to copy its link or text, ask Copilot about it, or bookmark it.
2 tables appear under this heading.
1. PDF page 191
| Paragraph | | Page |
|---|
| 1. | SCOPE | 1 |
| 1.1 | PURPOSE | 1 |
| 1.2 | APPLICATION | 1 |
| 1.3 | LIMITATIONS | 1 |
| 2. | TAILORING GUIDANCE | 2 |
| 2.1 | SELECTING THE RAIN METHOD | 2 |
| 2.1.1 | EFFECTS OF RAIN ENVIRONMENTS | 2 |
| 2.1.1.1 | IN THE ATMOSPHERE | 2 |
| 2.1.1.2 | ON IMPACT | 2 |
| 2.1.1.3 | AFTER DEPOSITION AND/OR PENETRATION | 2 |
| 2.1.2 | SEQUENCE AMONG OTHER METHODS | 2 |
| 2.2 | SELECTING PROCEDURES | 3 |
| 2.2.1 | PROCEDURE SELECTION CONSIDERATIONS | 3 |
| 2.2.2 | DIFFERENCE AMONG PROCEDURES | 3 |
| 2.3 | DETERMINE TEST LEVELS AND CONDITIONS | 3 |
| 2.3.1 | TEST ITEM CONFIGURATION | 3 |
| 2.3.2 | RAINFALL / DRIP RATE | 4 |
| 2.3.3 | DROPLET SIZE | 4 |
| 2.3.4 | WIND VELOCITY | 4 |
| 2.3.5 | TEST ITEM EXPOSURE SURFACE (ORIENTATION) | 5 |
| 2.3.6 | WATER PRESSURE | 5 |
| 2.3.7 | PREHEAT TEMPERATURE | 5 |
| 2.3.8 | EXPOSURE DURATION | 5 |
| 3. | INFORMATION REQUIRED | 5 |
| 3.1 | PRETEST | 5 |
| 3.2 | DURING TEST | 5 |
| 3.3 | POST-TEST | 6 |
| 4. | TEST PROCESS | 6 |
| 4.1 | TEST FACILITY | 6 |
| 4.1.1 | PROCEDURE I - RAIN AND BLOWING RAIN | 6 |
| 4.1.2 | PROCEDURE II - EXAGGERATED | 7 |
| 4.1.3 | PROCEDURE III - DRIP | 8 |
| 4.2 | CONTROLS | 9 |
| 4.3 | TEST INTERRUPTION | 10 |
| 4.3.1 | INTERRUPTION DUE TO CHAMBER MALFUNCTION | 10 |
| 4.3.2 | INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 10 |
| 4.4 | TEST EXECUTION | 10 |
| 4.4.1 | PREPARATION FOR TEST | 10 |
| 4.4.1.1 | PRELIMINARY STEPS | 10 |
| 4.4.1.2 | PRETEST STANDARD AMBIENT CHECKOUT | 10 |
| 4.4.2 | PROCEDURE I - RAIN AND BLOWING RAIN | 10 |
| 4.4.3 | PROCEDURE II - EXAGGERATED | 11 |
| 4.4.4 | PROCEDURE III - DRIP | 11 |
2. PDF page 192
| Paragraph | | Page |
|---|
| 5. | ANALYSIS OF RESULTS | 11 |
| 5.1 | OPERATIONAL FAILURE | 12 |
| 5.2 | WATER PENETRATION | 12 |
| 6. | REFERENCE/RELATED DOCUMENTS | 12 |
| 6.1 | REFERENCED DOCUMENTS | 12 |
| 6.2 | RELATED DOCUMENTS | 12 |
| FIGURES |
| FIGURE 506.6-1 | SAMPLE FACILITY FOR STEADY STATE RAIN OR DRIP TEST | 7 |
| FIGURE 506.6-2 | TYPICAL NOZZLE SETUP FOR EXAGGERATED TEST, PROCEDURE II (NOT INTENDED FOR USE WHEN CONDUCTING PROCEDURE I TESTING) | 8 |
| FIGURE 506.6-3 | DETAILS OF DISPENSER FOR DRIP TEST, PROCEDURE III | 9 |