| Paragraph | Page | |
|---|---|---|
| 1. | SCOPE | 1 |
| 1.1 | PURPOSE | 1 |
| 1.2 | APPLICATION | 1 |
| 1.3 | LIMITATIONS | 1 |
| 2. | TAILORING GUIDANCE | 1 |
| 2.1 | SELECTING THE LOW TEMPERATURE METHOD | 1 |
| 2.1.1 | EFFECTS OF LOW TEMPERATURE ENVIRONMENTS | 1 |
| 2.1.2 | SEQUENCE AMONG OTHER METHODS | 2 |
| 2.2 | SELECTING PROCEDURES | 2 |
| 2.2.1 | PROCEDURE SELECTION CONSIDERATIONS | 2 |
| 2.2.2 | DIFFERENCE AMONG PROCEDURES | 2 |
| 2.3 | DETERMINE TEST LEVELS AND CONDITIONS | 3 |
| 2.3.1 | CLIMATIC CONDITIONS | 3 |
| 2.3.2 | EXPOSURE DURATION | 5 |
| 2.3.3 | TEST ITEM CONFIGURATION | 5 |
| 2.3.4 | ADDITIONAL GUIDELINES | 5 |
| 3. | INFORMATION REQUIRED | 5 |
| 3.1 | PRETEST | 5 |
| 3.2 | DURING TEST | 6 |
| 3.3 | POST-TEST | 6 |
| 4. | TEST PROCESS | 6 |
| 4.1 | TEST FACILITY | 6 |
| 4.2 | CONTROLS | 6 |
| 4.3 | TEST INTERRUPTION | 6 |
| 4.3.1 | INTERRUPTION DUE TO CHAMBER MALFUNCTION | 7 |
| 4.3.2 | INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 7 |
| 4.4 | TEST SETUP | 7 |
| 4.5 | TEST EXECUTION | 7 |
| 4.5.1 | PREPARATION FOR TEST | 7 |
| 4.5.1.1 | PRELIMINARY STEPS | 7 |
| 4.5.1.2 | PRETEST STANDARD AMBIENT CHECKOUT | 7 |
| 4.5.2 | PROCEDURE I - STORAGE | 8 |
| 4.5.3 | PROCEDURE II - OPERATION | 8 |
| 4.5.4 | PROCEDURE III - MANIPULATION | 9 |
| 5. | ANALYSIS OF RESULTS | 9 |
| 6. | REFERENCE/RELATED DOCUMENTS | 10 |
| 6.1 | REFERENCED DOCUMENTS | 10 |
| 6.2 | RELATED DOCUMENTS | 10 |
Loading…