| Paragraph | Page |
|---|---|
| 1. SCOPE | 1 |
| 1.1 PURPOSE. | 1 |
| 1.2 APPLICATION. | 1 |
| 1.3 LIMITATIONS. | 1 |
| 2. TAILORING GUIDANCE | 1 |
| 2.1 SELECTING This Method. | 1 |
| 2.1.1 EFFECTS OF SOLAR RADIATION ENVIRONMENTS | 1 |
| 2.1.1.1 HEATING EFFECTS. | 1 |
| 2.1.1.2 ACTINIC EFFECTS. | 2 |
| 2.1.2 SEQUENCE AMONG OTHER METHODS. | 2 |
| 2.2 SELECTING PROCEDURES | 2 |
| 2.2.1 PROCEDURE SELECTION CONSIDERATIONS | 2 |
| 2.2.2 DIFFERENCE BETWEEN PROCEDURES. | 3 |
| 2.3 DETERMINE TEST LEVELS AND CONDITIONS. | 6 |
| 2.3.1 CLIMATIC CONDITIONS | 6 |
| 2.3.2 TEST DURATION | 6 |
| 2.3.3 HUMIDITY | 6 |
| 2.3.4 CONFIGURATION | 7 |
| 2.3.5 SPECTRAL POWER DISTRIBUTION - SEA LEVEL VERSUS HIGH GROUND ELEVATIONS. | 7 |
| 2.3.6 TEMPERATURE | 7 |
| 2.3.7 AIRFLOW | 7 |
| 2.4 TEST ITEM OPERATION. | 8 |
| 3. INFORMATION REQUIRED | 8 |
| 3.1 PRETEST | 8 |
| 3.2 DURING TEST | 8 |
| 3.3 POST-TEST. | 9 |
| 4. TEST PROCESS | 9 |
| 4.1 TEST FACILITY | 9 |
| 4.1.1 SUBSTRATE | 9 |
| 4.1.2 SOLAR RADIATION SOURCE | 10 |
| 4.2 CONTROLS. | 11 |
| 4.3 TEST INTERRUPTION. | 12 |
| 4.3.1 INTERRUPTION DUE TO CHAMBER MALFUNCTION. | 12 |
| 4.3.2 INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 13 |
| 4.4 TEST EXECUTION | 13 |
| 4.4.1 PREPARATION FOR TEST. | 13 |
| 4.4.1.1 PRELIMINARY STEPS | 13 |
| 4.4.1.2 PRETEST STANDARD AMBIENT CHECKOUT | 13 |
| 4.4.2 PROCEDURE I - CYCLING | 14 |
| 4.4.3 PROCEDURE II - STEADY STATE | 14 |
| 5. ANALYSIS OF RESULTS | 15 |
Loading…