| Paragraph | Page | |
|---|---|---|
| 1. | SCOPE | 1 |
| 1.1 | PURPOSE | 1 |
| 1.2 | APPLICATION | 1 |
| 1.3 | LIMITATIONS | 1 |
| 2. | TAILORING GUIDANCE | 1 |
| 2.1 | SELECTING THIS METHOD | 1 |
| 2.1.1 | EFFECTS OF HIGH TEMPERATURE ENVIRONMENTS | 1 |
| 2.1.2 | SEQUENCE AMONG OTHER METHODS | 2 |
| 2.2 | SELECTING PROCEDURES | 2 |
| 2.2.1 | PROCEDURE SELECTION CONSIDERATIONS | 2 |
| 2.2.2 | DIFFERENCE AMONG PROCEDURES | 3 |
| 2.3 | DETERMINE TEST LEVELS AND CONDITIONS | 3 |
| 2.3.1 | CLIMATIC CONDITIONS | 4 |
| 2.3.2 | EXPOSURE CONDITIONS | 6 |
| 2.3.3 | EXPOSURE DURATION | 7 |
| 2.3.3.1 | CONSTANT TEMPERATURE EXPOSURE | 7 |
| 2.3.3.2 | CYCLIC TEMPERATURE EXPOSURE | 8 |
| 2.3.4 | TEST ITEM CONFIGURATION | 8 |
| 2.3.5 | HUMIDITY | 8 |
| 2.4 | TEST ITEM OPERATION | 8 |
| 2.5 | ADDITIONAL GUIDELINES | 9 |
| 3. | INFORMATION REQUIRED | 9 |
| 3.1 | PRETEST | 9 |
| 3.2 | DURING TEST | 9 |
| 3.3 | POST-TEST | 9 |
| 4. | TEST PROCESS | 10 |
| 4.1 | TEST FACILITY | 10 |
| 4.2 | CONTROLS | 10 |
| 4.3 | TEST INTERRUPTION | 10 |
| 4.3.1 | INTERRUPTION DUE TO CHAMBER MALFUNCTION | 10 |
| 4.3.2 | INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 11 |
| 4.4 | TEST SETUP | 11 |
| 4.5 | TEST EXECUTION | 11 |
| 4.5.1 | PREPARATION FOR TEST | 11 |
| 4.5.1.1 | PRELIMINARY STEPS | 11 |
| 4.5.1.2 | PRETEST STANDARD AMBIENT CHECKOUT | 11 |
| 4.5.2 | PROCEDURE I - STORAGE | 11 |
| 4.5.3 | PROCEDURE II - OPERATION | 12 |
| 4.5.4 | PROCEDURE III - TACTICAL-STANDBY TO OPERATIONAL | 13 |
Loading…