| Paragraph | Page | |
|---|---|---|
| 1. | SCOPE | 1 |
| 1.1 | PURPOSE | 1 |
| 1.2 | APPLICATION | 1 |
| 1.3 | LIMITATIONS | 1 |
| 2. | TAILORING GUIDANCE | 1 |
| 2.1 | EFFECTS OF THE ENVIRONMENT | 1 |
| 2.2 | TEST PROCEDURES | 1 |
| 2.2.1 | PROCEDURE I - DIURNAL CYCLING EFFECTS | 2 |
| 2.2.2 | PROCEDURE II - FOGGING | 2 |
| 2.2.3 | PROCEDURE III - RAPID TEMPERATURE CHANGE | 2 |
| 2.3 | DETERMINE TEST LEVELS AND CONDITIONS | 2 |
| 2.3.1 | TEST ITEM CONFIGURATION | 2 |
| 2.3.2 | TEMPERATURE RANGE | 2 |
| 2.3.3 | MOISTURE | 2 |
| 2.3.4 | NUMBER OF CYCLES | 2 |
| 3. | INFORMATION REQUIRED | 3 |
| 3.1 | PRETEST | 3 |
| 3.2 | DURING TEST | 3 |
| 3.3 | POST-TEST | 3 |
| 4. | TEST PROCESS | 3 |
| 4.1 | TEST FACILITY | 3 |
| 4.2 | CONTROLS | 4 |
| 4.3 | TEST INTERRUPTIONS | 4 |
| 4.3.1 | INTERRUPTION DUE TO CHAMBER MALFUNCTION | 4 |
| 4.3.2 | INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 4 |
| 4.4 | TEST EXECUTION | 4 |
| 4.4.1 | PREPARATION FOR TEST | 4 |
| 4.4.1.1 | PRELIMINARY STEPS | 4 |
| 4.4.1.2 | PRETEST STANDARD AMBIENT CHECKOUT | 4 |
| 4.4.2 | PROCEDURE I - DIURNAL CYCLING EFFECTS | 5 |
| 4.4.3 | PROCEDURE II - FOGGING | 5 |
| 4.4.4 | PROCEDURE III - RAPID TEMPERATURE CHANGE | 5 |
| 5. | ANALYSIS OF RESULTS | 6 |
| 6. | REFERENCE/RELATED DOCUMENTS | 6 |
| 6.1 | REFERENCED DOCUMENTS | 6 |
| 6.2 | RELATED DOCUMENTS | 6 |
Loading…