| Paragraph | Page | ||
|---|---|---|---|
| 1. | SCOPE | 1 | |
| 1.1 | PURPOSE | 1 | |
| 1.2 | APPLICATION | 1 | |
| 1.3 | LIMITATIONS. | 2 | |
| 2. | TAILORING GUIDANCE.. | 2 | |
| 2.1 | SELECTING THE GUNFIRE SHOCK METHOD. | 2 | |
| 2.1.1 | EFFECTS OF A GUNFIRE SHOCK ENVIRONMENT | 2 | |
| 2.1.2 | SEQUENCE AMONG OTHER METHODS. | 3 | |
| 2.2 | SELECTING A PROCEDURE.. | 4 | |
| 2.2.1 | PROCEDURE SELECTION CONSIDERATIONS. | 4 | |
| 2.2.2 | DIFFERENCE AMONG PROCEDURES. | 5 | |
| 2.3 | DETERMINE TEST LEVELS AND CONDITIONS | 6 | |
| 2.3.1 | GENERAL CONSIDERATIONS | 6 | |
| 2.3.2 | TEST CONDITIONS. | 6 | |
| 2.3.3 | TEST AXES AND NUMBER OF GUNFIRE SHOCK EVENTS.. | 6 | |
| 2.4 | TEST ITEM CONFIGURATION (SEE PART ONE, PARAGRAPH 5.8) | 7 | |
| 2.5 | CONTROLS | 7 | |
| 2.5.1 | CONTROL OPTIONS | 7 | |
| 2.5.1.1 | OPEN/CLOSED LOOP | 7 | |
| 2.5.1.2 | SINGLE POINT CONTROL | 7 | |
| 2.5.1.3 | MULTIPLE POINT CONTROL | 7 | |
| 2.5.2 | CONTROL METHODS | 7 | |
| 2.5.2.1 | WAVEFORM CONTROL | 7 | |
| 2.5.2.2 | SPECTRUM CONTROL. | 7 | |
| 3. | INFORMATION REQUIRED. | 8 | |
| 3.1 | PRETEST.. | 8 | |
| 3.2 | DURING TEST. | 9 | |
| 3.3 | POST-TEST | 9 | |
| 4. | TEST PROCESS | 10 | |
| 4.1 | TEST FACILITY | 10 | |
| 4.2 | CONTROLS | 10 | |
| 4.2.1 | MEASURED MATERIEL INPUT/RESPONSE TIME HISTORY UNDER TWR.. | 12 | |
| 4.2.2 | SRS GENERATED SHOCK TIME HISTORY PULSE SEQUENCE UNDER TWR. | 12 | |
| 4.2.3 | STOCHASTICALLY GENERATED MATERIEL INPUT FROM PRELIMINARY DESIGN SPECTRUM UNDER TWR | 12 | |
| 4.3 | TEST INTERRUPTION | 12 | |
| 4.3.1 | INTERRUPTION FROM FAILURE OR MALFUNCTION OF ASSOCIATED LABORATORY TEST EQUIPMENT | 13 | |
| 4.3.2 | INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 13 | |
| 4.4 | TEST EXECUTION | 13 | |
| 4.4.1 | PREPARATION FOR TEST.. | 13 | |
Loading…