| Paragraph | Page | |
|---|---|---|
| 1. | SCOPE | 1 |
| 1.1 | PURPOSE | 1 |
| 1.2 | APPLICATION | 1 |
| 1.3 | LIMITATIONS | 1 |
| 2. | TAILORING GUIDANCE | 1 |
| 2.1 | SELECTING THE ICING/FREEZING RAIN METHOD | 1 |
| 2.1.1 | EFFECTS OF ICING/FREEZING RAIN | 1 |
| 2.1.2 | SEQUENCE AMONG OTHER METHODS | 2 |
| 2.2 | SELECTING PROCEDURE VARIATIONS | 2 |
| 2.2.1 | ICE FORMATION | 2 |
| 2.2.1.1 | PRINCIPAL CAUSES | 2 |
| 2.2.1.2 | TYPES OF ICE | 2 |
| 2.2.2 | CONFIGURATION AND ORIENTATION | 3 |
| 2.2.3 | TEST TEMPERATURE | 3 |
| 2.2.4 | WATER DELIVERY RATE | 3 |
| 2.2.5 | WATER DELIVERY METHOD | 3 |
| 2.2.6 | DROPLET SIZE | 3 |
| 2.2.7 | ICE THICKNESS | 3 |
| 2.3 | OPERATIONAL CONSIDERATIONS | 3 |
| 3. | INFORMATION REQUIRED | 4 |
| 3.1 | PRETEST | 4 |
| 3.2 | DURING TEST | 4 |
| 3.3 | POST-TEST | 4 |
| 4. | TEST PROCESS | 4 |
| 4.1 | TEST FACILITY | 4 |
| 4.2 | CONTROLS | 4 |
| 4.3 | TEST INTERRUPTION | 5 |
| 4.3.1 | INTERRUPTION DUE TO CHAMBER MALFUNCTION | 5 |
| 4.3.2 | INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 5 |
| 4.4 | TEST SETUP | 5 |
| 4.5 | TEST EXECUTION | 5 |
| 4.5.1 | PREPARATION FOR TEST | 5 |
| 4.5.1.1 | PRELIMINARY STEPS | 6 |
| 4.5.1.2 | PRETEST STANDARD AMBIENT CHECKOUT | 6 |
| 4.5.2 | PROCEDURE-ICE ACCRETION | 6 |
| 5. | ANALYSIS OF RESULTS | 7 |
| 6. | REFERENCE/RELATED DOCUMENTS | 7 |
| 6.1 | REFERENCED DOCUMENTS | 7 |
| 6.2 | RELATED DOCUMENTS | 7 |
Loading…