| Paragraph | Page | |
|---|---|---|
| 1. | SCOPE | 1 |
| 1.1 | PURPOSE | 1 |
| 1.2 | APPLICATION | 1 |
| 1.3 | LIMITATIONS. | 1 |
| 2. | TAILORING GUIDANCE. | 1 |
| 2.1 | SELECTING THE EXPLOSIVE ATMOSPHERE METHOD. | 1 |
| 2.1.1 | PROCEDURE I - EXPLOSIVE ATMOSPHERE. | 2 |
| 2.1.2 | PROCEDURE II - EXPLOSION CONTAINMENT | 2 |
| 2.1.3 | EFFECTS OF EXPLOSIVE ATMOSPHERE ENVIRONMENTS. | 2 |
| 2.1.4 | SEQUENCE AMONG OTHER METHODS. | 2 |
| 2.2 | SELECTING PROCEDURE VARIATIONS | 2 |
| 2.2.1 | FUEL | 2 |
| 2.2.2 | FUEL-VAPOR MIXTURE. | 3 |
| 2.2.3 | TEMPERATURE. | 4 |
| 2.2.4 | EFFECT OF HUMIDITY ON FLAMMABLE ATMOSPHERE | 4 |
| 2.2.5 | ALTITUDE SIMULATION | 4 |
| 2.3 | DEFINITIONS | 4 |
| 3. | INFORMATION REQUIRED. | 5 |
| 3.1 | PRETEST. | 5 |
| 3.2 | DURING TEST. | 5 |
| 3.3 | POST-TEST. | 5 |
| 4. | TEST PROCESS. | 5 |
| 4.1 | TEST FACILITY. | 5 |
| 4.2 | CONTROLS. | 6 |
| 4.3 | TEST INTERRUPTION. | 6 |
| 4.3.1 | TEST INTERRUPTION DUE TO CHAMBER MALFUNCTION. | 6 |
| 4.3.2 | TEST INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE. | 6 |
| 4.4 | TEST SETUP.. | 6 |
| 4.5 | TEST EXECUTION. | 6 |
| 4.5.1 | PREPARATION FOR TEST.. | 6 |
| 4.5.2 | PROCEDURE I - OPERATION IN AN EXPLOSIVE ATMOSPHERE | 7 |
| 4.5.3 | PROCEDURE II - EXPLOSION CONTAINMENT | 9 |
| 5. | ANALYSIS OF RESULTS. | 10 |
| 6. | REFERENCE/RELATED DOCUMENTS. | 10 |
| 6.1 | REFERENCED DOCUMENTS. | 10 |
| 6.2 | RELATED DOCUMENTS. | 10 |
Loading…