| Paragraph | Page | |
|---|---|---|
| 1. | SCOPE | 1 |
| 1.1 | PURPOSE | 1 |
| 1.2 | APPLICATION | 1 |
| 1.3 | LIMITATIONS | 1 |
| 2. | TAILORING GUIDANCE | 1 |
| 2.1 | SELECTING THE IMMERSION METHOD | 1 |
| 2.1.1 | EFFECTS OF LEAKAGE DURING IMMERSION | 1 |
| 2.1.2 | SEQUENCE AMONG OTHER METHODS | 1 |
| 2.2 | SELECTING PROCEDURES | 2 |
| 2.2.1 | PROCEDURE SELECTION CONSIDERATIONS | 2 |
| 2.2.2 | DIFFERENCE BETWEEN PROCEDURES | 2 |
| 2.3 | DETERMINE TEST LEVELS AND CONDITIONS | 2 |
| 2.3.1 | IDENTIFY CLIMATIC CONDITIONS | 2 |
| 2.3.2 | DETERMINE EXPOSURE CONDITIONS | 2 |
| 2.3.2.1 | TEST ITEM CONFIGURATION | 2 |
| 2.3.2.2 | CONDITIONING TEMPERATURE | 3 |
| 2.3.2.3 | DEPTH OF IMMERSION | 3 |
| 2.3.2.4 | DEPTH OF FORDING | 3 |
| 2.3.2.5 | MATERIEL FORDING | 4 |
| 2.3.2.6 | DURATION OF IMMERSION EXPOSURE | 4 |
| 3. | INFORMATION REQUIRED | 4 |
| 3.1 | PRETEST | 4 |
| 3.2 | DURING TEST | 4 |
| 3.3 | POST-TEST | 5 |
| 4. | TEST PROCESS | 5 |
| 4.1 | TEST FACILITY | 5 |
| 4.2 | CONTROLS | 5 |
| 4.3 | TEST INTERRUPTION | 5 |
| 4.3.1 | TEST INTERRUPTION DUE TO CHAMBER MALFUNCTION | 5 |
| 4.3.2 | TEST INTERRUPTION DUE TO TEST ITEM OPERATION FAILURE | 5 |
| 4.4 | TEST EXECUTION | 6 |
| 4.4.1 | PREPARATION FOR TEST | 6 |
| 4.4.1.1 | PRELIMINARY STEPS | 6 |
| 4.4.1.2 | PRETEST STANDARD AMBIENT CHECKOUT | 6 |
| 4.4.2 | PROCEDURE I - IMMERSION | 6 |
| 4.4.3 | PROCEDURE II - FORDING | 7 |
| 5. | ANALYSIS OF RESULTS | 7 |
| 6. | REFERENCE/RELATED DOCUMENTS | 7 |
| 6.1 | REFERENCED DOCUMENTS | 7 |
| 6.2 | RELATED DOCUMENTS | 7 |
Loading…