The following documents shall be submitted to the engineer of record and authority having jurisdiction prior to the initiation of production:
- (1) Material chemical composition report
- (2) First article inspection report
The following documents shall be submitted to the engineer of record and the authority having jurisdiction, prior to, or with shipment as applicable:
- (a) Production inspection and NDT reports
- (b) Tensile and CVN test reports
- (c) Weld repair reports