Inspection tasks and documentation for quality control and quality assurance for the seismic force-resisting system (SFRS) shall be as provided in accordance with the tables in Specification Section N5. Any tasks listed as Observe (O) shall be performed at least daily.
J6.1 Document (D)
The inspector shall prepare reports indicating that the work has been performed in accordance with the contract documents. The report need not provide detailed measurements for joint fit-up, welding procedure specification settings, completed welds, or other individual items listed in the tables. For shop fabrication, the report shall indicate the piece mark of the piece inspected. For field work, the report shall indicate the reference grid lines and floor or elevation inspected. Work not in compliance with the contract documents and whether the noncompliance has been satisfactorily repaired shall be noted in the inspection report.