The required FRL shall be as prescribed in IS 1641, IS 1642 and IS 1643, as appropriate or in building specifications or as required by the user or the city ordinance. The FRL specified in terms of the duration (in minutes) of standard fire load without collapse depends upon:
- a) the purpose for which structure is used, and
- b) the time taken to evacuate in case of fire.