The ODRC shall be responsible for the accurate location of lines and benchmarks at the jobsite and shall furnish the erector with a plan that contains all such information. The ODRC shall establish offset lines and reference elevations at each level for the erector's use in the positioning of adjustable items (see Section 11.3.1.3), if any.
Loading…