- 7.1 Method of Erection
- 7.2 Jobsite Conditions
- 7.3 Foundations, Piers, and Abutments
- 7.4 Lines and Benchmarks
- 7.5 Installation of Anchor Rods, Foundation Bolts, and Other Embedded Items
- 7.6 Installation of Bearing Devices
- 7.7 Grouting
- 7.8 Field Connection Material
- 7.9 Loose Material
- 7.10 Temporary Support of Structural Steel Frames
- 7.11 Safety Protection
- 7.12 Accumulation of Mill and Fabrication Tolerances
- 7.13 Owner's Acceptance
- 7.14 Correction of Errors
- 7.15 Cuts, Alterations, and Holes for Other Trades
- 7.16 Handling and Storage
- 7.17 Field Painting (see also Section 3.1)
- 7.18 Final Cleaning Up
Loading…