The ODRC shall provide a construction schedule in the bid documents. The period of performance by the steel fabricator and erector shall be mutually agreed upon with the ODRC prior to contract award.
Loading…
AISC 303-22, Code of Standard Practice for Steel Buildings and Bridges
Last Updated 29 Oct 2026
Hover any section to copy its link or text, ask Copilot about it, or bookmark it.
The ODRC shall provide a construction schedule in the bid documents. The period of performance by the steel fabricator and erector shall be mutually agreed upon with the ODRC prior to contract award.