When discrepancies exist between the design documents and specifications, the design documents shall govern. When discrepancies exist between scale dimensions in the design documents and the figures written in them, the figures shall govern. When discrepancies exist between the structural design documents and the architectural, electrical, or mechanical design documents, or the design documents for other trades, the structural design documents shall govern. When discrepancies exist between the design drawings and the design model, the governing document shall be as identified per Section 1.4.
When a discrepancy is discovered in the contract documents in the course of the fabricator’s work, the fabricator shall promptly notify the ODRC so that the discrepancy can be resolved. Such resolution shall be timely so as not to delay the fabricator’s work. See Sections 3.6 and 9.3.
It is not the fabricator’s responsibility to discover discrepancies, including those that are associated with the coordination of the various design disciplines.